Our Mission

Opening Space for Future Generations

MISSION I

Going Full Spectrum

First test flight of our launch vehicle 'Spectrum'

MISSION II

Onward and Upward

Second flight and qualification mission

 
Keep up to date

Mission in Motion

Get the latest mission news and company updates.

Video Stream

Join us Live

Join us for a live video broadcast of the next flight.

Video livestream

Discover Spectrum

Spectrum

Vehicle Length 28.0m
Vehicle diameter 2m

Aquila Engines

Propellant Oxygen/Propane
Engine Quantity 10

Targeted Performance Capability

Payload capability LEO 1.000kg
 
Follow our journey

Behind the Scenes

Look behind the scenes and experience how we are preparing our launch vehicle ‘Spectrum’ for its next mission

Isar Aerospace Isar Aerospace targets second launch not earlier than 21 January 2026
Stage 1 Static Fire at Andoya Spaceport c Isar Aerospace
Spectrum Lift off new c Isar Aerospace Brady Kenniston NASA Spaceflight com
C Isar Aerospace Esrange Test Facility
Isar Aerospace Launch site at Andøya Spaceport 1
Isar Aerospace Launch site at Andøya Spaceport 2
Isar Aerospace Nutzlastverkleidung des Launch Vehicles Spectrum 2
Advanced 3 D Printing C Isar Aerospace
Copyright Isar Aerospace Engine Test
Esrange Engine Testing C Isar Aerospace
Isar Aerospace Production C Isar Aerospace
Kiruna Engine Test Stand C Isar Aerospace
Launcher Assembly Copyright Isar Aerospace
Production Facility C Isar Aerospace

Start your journey

Reserve your orbital missions now and secure desired launch windows.

Book your flight